Event Check-In Staffing Calculator for Peak Arrivals
Estimate the number of check-in desks needed during an arrival rush using the expected guest count, peak window, service time and target utilization.
Formula & assumptions
Desks = ceiling[arrivals × seconds per guest ÷ (window minutes × 60 × target utilization fraction)]
Each desk serves one guest at a time at the same mean speed. Use the busiest arrival window. A headcount estimate cannot predict individual wait times.
Worked example
- Arrivals during the peak window
- 120
- Peak arrival window (min)
- 20
- Service time per guest (seconds)
- 25
- Target utilization (%)
- 80
- Check-in desks required
- 4 desks
Interpreting the result
Three open desks can process 120 guests over the example window at the selected service speed. Shorter arrival bursts can still produce a queue.