Print Run Paper Calculator with Spoilage and Make-Ready
Estimate the number of press sheets to order for a finished quantity, allowing for copies per sheet, expected production spoilage and setup sheets.
Formula & assumptions
Stock = make-ready sheets + ceiling[ceiling(pieces ÷ pieces per sheet) ÷ (1 − spoilage fraction)]
Make-ready is a fixed count used before production. Apply spoilage only to the production sheets. Round up to a whole sheet at each step.
Worked example
- Finished pieces required
- 1000
- Pieces per good sheet
- 8
- Expected sheet spoilage (%)
- 4
- Fixed make-ready sheets
- 20
- Stock to order
- 151 sheets
Interpreting the result
For 1,000 pieces at eight per sheet, 125 sheets must pass. A 4% spoilage estimate raises production stock to 131 sheets before adding the 20 setup sheets.