Average Total Inspection for Rectifying Sampling
Estimate how many pieces get inspected per lot when all lots receive a sample inspection and rejected lots receive screening of their remaining units.
Measure first-pass yield, takt time and equipment effectiveness, or calculate Cp and Cpk from process data. Explore production and quality metrics.
Try a shorter search or choose another category.
Estimate how many pieces get inspected per lot when all lots receive a sample inspection and rejected lots receive screening of their remaining units.
Find the percentage of revenue represented by prevention, appraisal, internal failure, and external failure costs during one reporting period.
Calculate DPMO from observed defects, inspected units, and distinct opportunities per unit to compare runs with different inspection volumes.
Estimate an economic batch size in units when production and consumption occur simultaneously, using demand, production capacity, setup cost, and holding cost.
Estimate seconds per part including the machining cycle, loading and unloading, and each part’s share of a batch changeover.
Find the percentage of planned production time a machine was running using scheduled minutes and total stop minutes during that window.
Update an exponentially weighted moving average using one new process measurement, the previous smoothed value, and the weight assigned to the new reading.
Find the percentage of production units that passed inspection on their first attempt using the passing count and the number entering the operation.
Find signed gauge bias in the original measurement units by comparing the average of repeated readings with an assigned reference value.
Convert minutes saved per setup into annual production hours using average weekly changeover frequency and the number of working weeks.
Calculate both limits of an individuals chart using a stable baseline mean and the average range between pairs of successive measurements.
Size a kanban replenishment loop in whole cards using hourly usage, replenishment lead time, buffer percentage, and units per container.
Compare total work content in seconds with workstation count and line cycle time to calculate assembly line balancing efficiency.
Estimate the chance of accepting a large lot from its underlying defective percentage, the inspection sample size, and the most defects the plan allows.
Find material utilization as a percentage of input mass that leaves production as accepted finished product, using kilograms for both measurements.
Estimate mean time between failures from accumulated equipment operating hours and observed failures. The result is operating hours per failure.
Calculate mean time to repair in hours from active maintenance time and the number of completed repairs in the reporting period.
Estimate milling material removal in cubic centimeters per minute from the engaged width, depth of cut, and programmed table feed.
Convert a cutting speed in meters per minute and effective tool diameter in millimeters into the spindle speed in revolutions per minute.
Calculate milling table feed in millimeters per minute from chip load per tooth, effective tooth count, and spindle RPM.
Calculate overall equipment effectiveness from availability, performance, and quality percentages for the same production run.
Find the lower and upper three-sigma limits for a subgroup’s defective percentage using its unit count and a stable baseline defective rate.
Calculate Cp from upper and lower specification limits and within-process standard deviation to compare manufacturing tolerance with process spread.
Calculate Cpk from the process mean, within-process standard deviation, and upper and lower specification limits to assess process capability.
Calculate accepted units produced per direct labor-hour by combining the good output from a run with hours worked by its production team.
Calculate the percentage of parts scrapped from a production run using discarded units and the total number produced, including rejects.
Estimate how many whole units to start for a required good-unit count after accounting for the expected final production yield.
Combine the first-pass yields of up to three consecutive production steps to estimate the percentage of units that finish the route without rework.
Convert net production minutes and customer demand for the same shift into takt time in seconds per unit.
Calculate Cpm from process variation, the difference between mean and target, and the width of the specification interval in the same measurement units.
Calculate total effective equipment performance across a full calendar window from the OEE achieved during its scheduled production hours.
Calculate a subgroup’s control limits in defects per unit from the baseline defect density and the number of comparable inspection units in that subgroup.
Apply Little’s law to average throughput in units per hour and average flow time in hours to estimate work-in-process inventory.
Calculate the minimum and maximum millimeter dimensions of a linear assembly using its nominal size and three symmetric component tolerances.